Pipework Fabrication project

Essex Mechanical Services Limited

Barking Energy Centre

Quota
Undisclosed

Pipetech was contracted to supply and prefabricate carbon steel pipework for an Energy Centre in Barking, Essex. This project involved the installation of DN300 gas mains and DN350 Low-Temperature Hot Water (LTHW) pipework to ensure the efficient distribution of energy throughout the facility. As with all critical infrastructure, timely delivery and strict quality assurance were essential for meeting the high standards required.

Pipetech provided the design, supply, and prefabrication of the carbon steel pipework, including DN300 gas mains and DN350 LTHW pipework, ensuring compliance with the client’s precise specifications. The scope also required Gas Safe registered installers to meet the safety and regulatory standards for gas systems. Full quality assurance processes were implemented, including material traceability, weld mapping, and Non-Destructive Testing (NDT). The installation was completed on time, with Pipetech ensuring that all safety measures and regulatory requirements were met, including Gas Safe compliance, allowing the Energy Centre to operate seamlessly and safe

New project in the pipeline

Get in touch today