Located in the Slough Trading Estate, Kao Data KLON-06 is a 16MW Tier 3 colocation facility within the West London Availability Zone, designed for enterprise and cloud workloads. With a 1.25 PUE, 100% renewable energy supply, and advanced sustainability features such as HVO-powered generators and lithium-ion UPS, the site sets new standards in low-carbon, high-efficiency data centre design. Phase 4 builds on the success of previous phases and will deliver a 1.5MW data hall with full N+1 redundancy.
As part of the Phase 4 delivery, Pipetech was contracted to design, supply, and install a fully offsite prefabricated plantroom serving the critical cooling infrastructure. The plantroom housed high-specification stainless steel pipework, fabricated in-house to strict tolerances and assembled under controlled conditions to ensure quality and speed of deployment. This offsite approach significantly reduced time on site, improved safety, and supported Kao Data’s need for rapid scalability and operational continuity